2007/06 Caution for the disguised e-mail
2009/07 NEDO Model ProjectSinter Cooler Waste Heat Recovery System atRINL/VIZAG Steel Plant (India) 2009/05 Establishment of new engineering company in Shanghai, China 2009/02 Receipt of order for state-of-the-art electric arc furnaceECOARCTM from South Korea 2008/09 Head office removed to the portside "Kanagawa-ku of Yokohama " City. 2008/01 Received an Big Order from China Steel Corporation, Taiwan for Continuous Annealing Line and Continuous Galvanizing Line of No.3 Cold Rolling Mill Complex Project at Kaohsiung Works 2007/05 Continuous Order of Cold Leveller in Europe To be installed in Heavy Plate Shop of Rautaruukki, Finland Just after order from ILVA, Italy Received an Order from Hyundai Steel Company, Korea for Steel Making Plant of New Integrated Steel Mill at Dangjin Works 2007/03 Order taking from COSIPA for Modification of No.5 & 6BOF Gas Dedusting System 2006/12 Steel Plantech and Sojitz receive an Order of Cold Leveller to be installed at Plate Shop of ILVA under the Riva Group, Italy's Largest Steel Mills 2004/07 Steel Plantech received an Major Order for Continuous Casting Plant from Companhia Siderurgica de Tubarao(CST), Brazil.